Sciweavers

64 search results - page 3 / 13
» A Constraint-Based Method for Project Scheduling with Time W...
Sort
View
CPAIOR
2010
Springer
13 years 10 months ago
Single-Facility Scheduling over Long Time Horizons by Logic-Based Benders Decomposition
Abstract. Logic-based Benders decomposition can combine mixed integer programming and constraint programming to solve planning and scheduling problems much faster than either metho...
Elvin Coban, John N. Hooker
ATAL
2003
Springer
13 years 10 months ago
A multiagent-system for integrating a large-scale project
This paper presents a multiagent-system for integrating ALICE: a real-life, distributed, large-scale particle physics experiment of the LHC project at CERN. The work is concerned ...
Carlos Eisenberg, Boi Faltings, Lars Leistam
COR
2011
13 years 9 days ago
Time-constrained project scheduling with adjacent resources
We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with Adjacent Resources. For adjacent resources the resource units are ordered and th...
Johann Hurink, A. L. Kok, Jacob Jan Paulus, J. M. ...
ICIP
2005
IEEE
14 years 7 months ago
Irregular pattern matching using projections
Recently, a novel approach to pattern matching was introduced, which reduces time complexity by two orders of magnitude over traditional approaches. It uses an efficient projectio...
Michal Ben-Yehuda, Lihi Cadany, Hagit Hel-Or
ICPP
2000
IEEE
13 years 9 months ago
Evaluation of Loop Grouping Methods Based on Orthogonal Projection Spaces
This paper compares three similar loop-grouping methods. All methods are based on projecting the n-dimensional iteration space Jn onto a k-dimensional one, called the projected sp...
Ioannis Drositis, Georgios I. Goumas, Nectarios Ko...