Sciweavers

22 search results - page 1 / 5
» An Optimization-Based Approach for Design Project Scheduling
Sort
View
TASE
2008
IEEE
13 years 4 months ago
An Optimization-Based Approach for Design Project Scheduling
Concurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design tas...
Ming Ni, Peter B. Luh, Bryan Moser
TSMC
2010
12 years 11 months ago
Optimizing Discounted Cash Flows in Project Scheduling - An Ant Colony Optimization Approach
Abstract--The multimode resource-constrained projectscheduling problem with discounted cash flows (MRCPSPDCF) is important and challenging for project management. As the problem is...
Wei-neng Chen, Jun Zhang, Henry Shu-Hung Chung, Ru...
SE
2007
13 years 6 months ago
Towards integration driven design
: Despite the fact, that testing and integration belong to the most critical and time consuming activities especially in big software development projects, most projects are still ...
Stephan Jacobs
CISIS
2009
IEEE
13 years 11 months ago
Application of a Critical Chain Project Management Based Framework on Max-Plus Linear Systems
Abstract. We focus on discrete event systems with a structure of parallel processing, synchronization, and noconcurrency. We use max-plus algebra, which is an effective approach fo...
Hirotaka Takahashi, Hiroyuki Goto, Munenori Kasaha...
IPPS
2009
IEEE
13 years 11 months ago
EmBOINC: An emulator for performance analysis of BOINC projects
BOINC is a platform for volunteer computing. The server component of BOINC embodies a number of scheduling policies and parameters that have a large impact on the projects through...
Trilce Estrada, Michela Taufer, Kevin Reed, David ...