Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
In this paper we deal with the problem of modeling railway networks with Petri nets so as to apply the theory of supervisory control for discrete event systems to automatically de...
This paper presents a formal approach based on Time Petri net (TPN) for the coherence control of SMIL documents. TPN model has been widely used to specify real time systems. The q...
With rapid development of the Internet, e-learning system has become more and more popular. Currently, to solve the issue of sharing and reusing of teaching materials in different...
Jun-Ming Su, Shian-Shyong Tseng, Chia-Yu Chen, Jui...
Design of embedded systems is a complex task that requires design cycles founded upon formal notation, so that the synthesis from specification to implementation can be carried ou...