Sciweavers

13 search results - page 1 / 3
» Group sequencing around a common due date
Sort
View
DISOPT
2008
89views more  DISOPT 2008»
13 years 4 months ago
Group sequencing around a common due date
The problem of scheduling groups of jobs on a single machine under the group technology assumption is studied. Jobs of the same group are processed contiguously and a sequence ind...
T. C. Edwin Cheng, Mikhail Y. Kovalyov, C. T. Ng, ...
COCOON
2009
Springer
13 years 2 months ago
An FPTAS for the Minimum Total Weighted Tardiness Problem with a Fixed Number of Distinct Due Dates
Given a sequencing of jobs on a single machine, each one with a weight, processing time, and a due date, the tardiness of a job is the time needed for its completion beyond its du...
George Karakostas, Stavros G. Kolliopoulos, Jing W...
HRI
2006
ACM
13 years 10 months ago
Working with robots and objects: revisiting deictic reference for achieving spatial common ground
Robust joint visual attention is necessary for achieving a common frame of reference between humans and robots interacting multimodally in order to work together on realworld spat...
Andrew G. Brooks, Cynthia Breazeal
BMCBI
2006
147views more  BMCBI 2006»
13 years 4 months ago
Grouping Gene Ontology terms to improve the assessment of gene set enrichment in microarray data
Background: Gene Ontology (GO) terms are often used to assess the results of microarray experiments. The most common way to do this is to perform Fisher's exact tests to find...
Alex Lewin, Ian C. Grieve
NAR
2011
233views Computer Vision» more  NAR 2011»
12 years 7 months ago
ArachnoServer 2.0, an updated online resource for spider toxin sequences and structures
ArachnoServer (www.arachnoserver.org) is a manually curated database providing information on the sequence, structure and biological activity of protein toxins from spider venoms....
Volker Herzig, David L. A. Wood, Felicity Newell, ...