This paper presents three methods implemented in the activity-based construction modeling and simulation (ABC) system for validating a construction simulation. The first method re...
A method for automatically improving the performance of construction operations was developed by the integration of computer simulation and belief networks. The simulation model i...
Pouring a concrete raft slab is a classic problem in downtown projects because it requires special arrangements to be made with city authorities to close the area around the proje...
Eight successively refined simulation models for the earthmoving operations involved in the construction of a dam provide the foundation for illustrating the ease and effectivenes...