Sciweavers

13 search results - page 2 / 3
» Scheduling Resources in Programmable and Active Networks Bas...
Sort
View
WSC
1997
13 years 6 months ago
Petri Net Based Simulation of Construction Schedules
Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
Anil Sawhney
ISCAS
2002
IEEE
108views Hardware» more  ISCAS 2002»
13 years 10 months ago
Optimal adaptive bandwidth monitoring for QoS based retrieval
—Network aware multimedia delivery applications are a class of applications that provide certain level of quality of service (QoS) guarantees to end users while not assuming unde...
Yinzhe Yu, Anup Basu, Irene Cheng
IPSN
2004
Springer
13 years 10 months ago
Backcasting: adaptive sampling for sensor networks
Wireless sensor networks provide an attractive approach to spatially monitoring environments. Wireless technology makes these systems relatively flexible, but also places heavy d...
Rebecca Willett, Aline Martin, Robert Nowak
IPSN
2007
Springer
13 years 11 months ago
Power scheduling for wireless sensor and actuator networks
We previously presented a model for some wireless sensor and actuator network (WSAN) applications based on the vector space tools of frame theory. In this WSAN model there is a we...
Christopher J. Rozell, Don H. Johnson
ADHOCNETS
2010
Springer
13 years 2 months ago
DCLA: A Duty-Cycle Learning Algorithm for IEEE 802.15.4 Beacon-Enabled WSNs
The current specification for IEEE 802.15.4 beacon-enabled networks does not define how active and sleep schedules should be configured in order to achieve the optimal network perf...
Rodolfo de Paz Alberola, Dirk Pesch