Sciweavers

12 search results - page 1 / 3
» Using Iterative Repair to Improve the Responsiveness of Plan...
Sort
View
AIPS
2000
13 years 6 months ago
Using Iterative Repair to Improve the Responsiveness of Planning and Scheduling
The majority of planning and scheduling research has focused on batch-oriented models of planning. This paper discusses the use of iterative repair techniques to support a continu...
Steve A. Chien, Russell Knight, Andre Stechert, Ro...
ESANN
2003
13 years 6 months ago
Improving iterative repair strategies for scheduling with the SVM
The resource constraint project scheduling problem (RCPSP) is an NP-hard benchmark problem in scheduling which takes into account the limitation of resources’ availabilities in ...
Kai Gersmann, Barbara Hammer
CORR
2008
Springer
112views Education» more  CORR 2008»
13 years 5 months ago
Improved Squeaky Wheel Optimisation for Driver Scheduling
Abstract. This paper presents a technique called Improved Squeaky Wheel Optimisation (ISWO) for driver scheduling problems. It improves the original Squeaky Wheel Optimisation'...
Uwe Aickelin, Edmund K. Burke, Jingpeng Li
IJCAI
2003
13 years 6 months ago
Maximizing Flexibility: A Retraction Heuristic for Oversubscribed Scheduling Problems
In this paper we consider the solution of scheduling problems that are inherently over-subscribed. In such problems, there are always more tasks to execute within a given time fra...
Laurence A. Kramer, Stephen F. Smith
AIPS
2004
13 years 6 months ago
Guiding Planner Backjumping Using Verifier Traces
In this paper, we show how a planner can use a modelchecking verifier to guide state space search. In our work on hard real-time, closed-loop planning, we use a modelchecker'...
Robert P. Goldman, Michael J. S. Pelican, David J....