Sciweavers

34 search results - page 7 / 7
» tase 2008
Sort
View
TASE
2008
IEEE
13 years 4 months ago
Optimization of Joint Replacement Policies for Multipart Systems by a Rollout Framework
Maintaining an asset with life-limited parts, e.g., a jet engine or an electric generator, may be costly. Certain costs, e.g., setup cost, can be shared if some parts of the asset ...
Tao Sun, Qianchuan Zhao, Peter B. Luh, Robert N. T...
TASE
2008
IEEE
13 years 4 months ago
Group Elevator Scheduling With Advance Information for Normal and Emergency Modes
Group elevator scheduling has long been recognized as an important problem for building transportation efficiency, since unsatisfactory elevator service is one of the major complai...
Peter B. Luh, Bo Xiong, Shi-Chung Chang
TASE
2008
IEEE
13 years 4 months ago
On Clamping Planning in Workpiece-Fixture Systems
Deformation at contacts between the workpiece and locators/clamps resulting from large contact forces causes overall workpiece displacement, and affects the localization accuracy o...
Caihua Xiong, Michael Yu Wang, You-Lun Xiong
TASE
2008
IEEE
13 years 4 months ago
Lean Buffering in Serial Production Lines With Nonidentical Exponential Machines
Lean buffering is the smallest buffer capacity, which is necessary and sufficient to ensure the desired production rate of a manufacturing system. Literature offers methods for des...
Shu-Yin Chiang, Alexander Hu, Semyon M. Meerkov