Sciweavers

TASE
2008
IEEE
13 years 4 months ago
Lean Buffering in Serial Production Lines With Nonidentical Exponential Machines
Lean buffering is the smallest buffer capacity, which is necessary and sufficient to ensure the desired production rate of a manufacturing system. Literature offers methods for des...
Shu-Yin Chiang, Alexander Hu, Semyon M. Meerkov
TASE
2008
IEEE
13 years 4 months ago
On Clamping Planning in Workpiece-Fixture Systems
Deformation at contacts between the workpiece and locators/clamps resulting from large contact forces causes overall workpiece displacement, and affects the localization accuracy o...
Caihua Xiong, Michael Yu Wang, You-Lun Xiong
TASE
2008
IEEE
13 years 4 months ago
Group Elevator Scheduling With Advance Information for Normal and Emergency Modes
Group elevator scheduling has long been recognized as an important problem for building transportation efficiency, since unsatisfactory elevator service is one of the major complai...
Peter B. Luh, Bo Xiong, Shi-Chung Chang
TASE
2008
IEEE
13 years 4 months ago
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem
This paper addresses the general single-machine earliness-tardiness problem with distinct release dates, due dates, and unit costs. The aim of this research is to obtain an exact n...
Hoksung Yau, Yunpeng Pan, Leyuan Shi
TASE
2008
IEEE
13 years 4 months ago
Optimization of Joint Replacement Policies for Multipart Systems by a Rollout Framework
Maintaining an asset with life-limited parts, e.g., a jet engine or an electric generator, may be costly. Certain costs, e.g., setup cost, can be shared if some parts of the asset ...
Tao Sun, Qianchuan Zhao, Peter B. Luh, Robert N. T...
TASE
2008
IEEE
13 years 4 months ago
Modeling and Supervisory Control of Railway Networks Using Petri Nets
In this paper we deal with the problem of modeling railway networks with Petri nets so as to apply the theory of supervisory control for discrete event systems to automatically de...
Alessandro Giua, Carla Seatzu
TASE
2008
IEEE
13 years 4 months ago
An Optimization-Based Approach for Design Project Scheduling
Concurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design tas...
Ming Ni, Peter B. Luh, Bryan Moser
TASE
2008
IEEE
13 years 4 months ago
Randomized Optimal Design of Parallel Manipulators
This work intends to deal with the optimal kinematic synthesis problem of parallel manipulators under a unified framework. Observing that regular (e.g., hyper-rectangular) workspac...
Yunjiang Lou, Guanfeng Liu, Zexiang Li
TASE
2008
IEEE
13 years 4 months ago
New Hybrid Optimization Algorithms for Machine Scheduling Problems
Dynamic programming, branch-and-bound, and constraint programming are the standard solution principles for nding optimal solutions to machine scheduling problems. We propose a new ...
Yunpeng Pan, Leyuan Shi
TASE
2008
IEEE
13 years 4 months ago
Stochastic Modeling of an Automated Guided Vehicle System With One Vehicle and a Closed-Loop Path
Abstract--The use of automated guided vehicles (AGVs) in material-handling processes of manufacturing facilities and warehouses isbecomingincreasinglycommon.AcriticaldrawbackofanAG...
Aykut F. Kahraman, Abhijit Gosavi, Karla J. Oty