Sciweavers

1989 search results - page 37 / 398
» cost 2010
Sort
View
JAIR
2010
167views more  JAIR 2010»
14 years 10 months ago
The LAMA Planner: Guiding Cost-Based Anytime Planning with Landmarks
LAMA is a classical planning system based on heuristic forward search. Its core feature is the use of a pseudo-heuristic derived from landmarks, propositional formulas that must b...
Silvia Richter, Matthias Westphal
CORR
2010
Springer
141views Education» more  CORR 2010»
14 years 10 months ago
Popularity at Minimum Cost
We consider an extension of the popular matching problem in this paper. The input to the popular matching problem is a bipartite graph G = (A ∪ B, E), where A is a set of people,...
Telikepalli Kavitha, Meghana Nasre, Prajakta Nimbh...
ICDCS
2010
IEEE
15 years 1 months ago
Minimizing Probing Cost and Achieving Identifiability in Network Link Monitoring
Continuously monitoring the link performance is important to network diagnosis. Recently, active probes sent between end systems are widely used to monitor the link performance. I...
Qiang Zheng, Guohong Cao
WOSP
2010
ACM
15 years 2 hour ago
Automatically improve software architecture models for performance, reliability, and cost using evolutionary algorithms
Quantitative prediction of quality properties (i.e. extrafunctional properties such as performance, reliability, and cost) of software architectures during design supports a syste...
Anne Martens, Heiko Koziolek, Steffen Becker, Ralf...