Sciweavers

EUSFLAT
2003

Minimisation of the expected weighted number of jobs being late with fuzzy processing time in a one machine system

13 years 6 months ago
Minimisation of the expected weighted number of jobs being late with fuzzy processing time in a one machine system
One machine scheduling problem with fuzzy processing times and a penalty for each job being late (the penalty is independent of the magnitude of the lateness) is considered. The optimal sequence is defined as one minimizing the expected value of the total penalty (the expected weighted number of jobs being late). Two special cases are discussed in which the problem can be reduced to well-known and easy to solve optimization problems.
Barbara Gladysz, Dorota Kuchta
Added 31 Oct 2010
Updated 31 Oct 2010
Type Conference
Year 2003
Where EUSFLAT
Authors Barbara Gladysz, Dorota Kuchta
Comments (0)