Sciweavers

277 search results - page 3 / 56
» Just-In-Time Scheduling with Constraint Programming
Sort
View
IFIP
1998
Springer
13 years 10 months ago
Scheduling in a Multi-Agent Environment
A new scheduling agent for existing CIM multi-agent system is being currently developed at the Technical University of Kosice. The basic idea is to create an agent based on Schedu...
M. Schmotzer, Jan Paralic, Julius Csontó
CP
2008
Springer
13 years 7 months ago
An Application of Constraint Programming to Superblock Instruction Scheduling
Modern computer architectures have complex features that can only be fully taken advantage of if the compiler schedules the compiled code. A standard region of code for scheduling ...
Abid M. Malik, Michael Chase, Tyrel Russell, Peter...
VLSID
1994
IEEE
124views VLSI» more  VLSID 1994»
13 years 9 months ago
ILP-Based Scheduling with Time and Resource Constraints in High Level Synthesis
In this paper, we present a formal analysis of the constraints of the scheduling problem, and evaluate the structure of the scheduling polytope described by those constraints. Pol...
Samit Chaudhuri, Robert A. Walker
ANOR
2011
214views more  ANOR 2011»
13 years 21 days ago
A hybrid constraint programming approach to the log-truck scheduling problem
Abstract. Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization te...
Nizar El Hachemi, Michel Gendreau, Louis-Martin Ro...