Sciweavers

APCSAC
2006
IEEE

A Context-Switch Reduction Heuristic for Power-Aware Off-Line Scheduling

13 years 10 months ago
A Context-Switch Reduction Heuristic for Power-Aware Off-Line Scheduling
Abstract. Scheduling algorithms significantly affect the performance of a realtime system. In systems with power constraints, context switches in a schedule result in wasted power consumption. We present a scheduling algorithm and a heuristic for reducing the number of context switches. The algorithm executes in near linear time in terms of the number of jobs, finds a feasible schedule in most cases if it exists, and reasonably reduces the number of context switches. Thus it is a power-aware scheduling algorithm.
Biju K. Raveendran, Sundar Balasubramaniam, K. Dur
Added 10 Jun 2010
Updated 10 Jun 2010
Type Conference
Year 2006
Where APCSAC
Authors Biju K. Raveendran, Sundar Balasubramaniam, K. Durga Prasad, S. Gurunarayanan
Comments (0)