Sciweavers

11 search results - page 1 / 3
» A simulation based optimization algorithm for slack reductio...
Sort
View
WSC
2008
13 years 7 months ago
A simulation based optimization algorithm for slack reduction and workforce scheduling
In an assembly line with high labor proportion, the workforce planning and scheduling is a very complex problem. At the background of increasing labor costs, it is very important ...
Daniel Noack, Oliver Rose
DAC
2008
ACM
13 years 6 months ago
Leakage power-aware clock skew scheduling: converting stolen time into leakage power reduction
Clock skew scheduling has been traditionally considered as a tool for improving the clock period in a sequential circuit. Timing slack is "stolen" from fast combinationa...
Min Ni, Seda Ogrenci Memik
ECRTS
2005
IEEE
13 years 10 months ago
Energy Aware Non-Preemptive Scheduling for Hard Real-Time Systems
Slowdown based on dynamic voltage scaling (DVS) provides the ability to perform an energy-delay tradeoff in the system. Non-preemptive scheduling becomes an integral part of syste...
Ravindra Jejurikar, Rajesh K. Gupta
DATE
2009
IEEE
133views Hardware» more  DATE 2009»
13 years 11 months ago
Energy efficient multiprocessor task scheduling under input-dependent variation
— In this paper, we propose a novel, energy aware scheduling algorithm for applications running on DVS-enabled multiprocessor systems, which exploits variation in execution times...
Jason Cong, Karthik Gururaj
DATE
2006
IEEE
142views Hardware» more  DATE 2006»
13 years 11 months ago
Physical-aware simulated annealing optimization of gate leakage in nanoscale datapath circuits
For CMOS technologies below 65nm, gate oxide direct tunneling current is a major component of the total power dissipation. This paper presents a simulated annealing based algorith...
Saraju P. Mohanty, Ramakrishna Velagapudi, Elias K...