Sciweavers

11 search results - page 1 / 3
» A simulation based optimization algorithm for slack reductio...
Sort
View
WSC
2008
13 years 7 months ago
A simulation based optimization algorithm for slack reduction and workforce scheduling
In an assembly line with high labor proportion, the workforce planning and scheduling is a very complex problem. At the background of increasing labor costs, it is very important ...
Daniel Noack, Oliver Rose
DAC
2008
ACM
13 years 7 months ago
Leakage power-aware clock skew scheduling: converting stolen time into leakage power reduction
Clock skew scheduling has been traditionally considered as a tool for improving the clock period in a sequential circuit. Timing slack is "stolen" from fast combinationa...
Min Ni, Seda Ogrenci Memik
ECRTS
2005
IEEE
13 years 11 months ago
Energy Aware Non-Preemptive Scheduling for Hard Real-Time Systems
Slowdown based on dynamic voltage scaling (DVS) provides the ability to perform an energy-delay tradeoff in the system. Non-preemptive scheduling becomes an integral part of syste...
Ravindra Jejurikar, Rajesh K. Gupta
DATE
2009
IEEE
133views Hardware» more  DATE 2009»
14 years 1 days ago
Energy efficient multiprocessor task scheduling under input-dependent variation
— In this paper, we propose a novel, energy aware scheduling algorithm for applications running on DVS-enabled multiprocessor systems, which exploits variation in execution times...
Jason Cong, Karthik Gururaj
DATE
2006
IEEE
142views Hardware» more  DATE 2006»
13 years 11 months ago
Physical-aware simulated annealing optimization of gate leakage in nanoscale datapath circuits
For CMOS technologies below 65nm, gate oxide direct tunneling current is a major component of the total power dissipation. This paper presents a simulated annealing based algorith...
Saraju P. Mohanty, Ramakrishna Velagapudi, Elias K...