Sciweavers

178
Voted
GLOBECOM
2008
IEEE

Delay Analysis of Aloha Network

16 years 2 months ago
Delay Analysis of Aloha Network
—This paper provides a queueing analysis for the slotted Aloha network. We assume the use of an exponential backoff protocol. Most prior work on slotted Aloha focuses on the analysis of its saturation throughput. Good saturation throughput, however, does not automatically translate to good delay performance for the end users. For example, it is well-known that the maximum possible throughput of slotted Aloha with a large number of nodes is 1 0.3679e− = . Prior work showed that binary backoff factor of 2r = can achieve a saturation throughput of 0.3466 , which is very close to the 1 e− . However, this paper shows that if mean queuing delay is to be bounded, then the offered load must be below 0.2158, a drastic 41% drop from 1 e−
Soung Chang Liew, Ying Jun Zhang, Da Rui Chen
Added 29 May 2010
Updated 29 May 2010
Type Conference
Year 2008
Where GLOBECOM
Authors Soung Chang Liew, Ying Jun Zhang, Da Rui Chen
Comments (0)