Sciweavers

237
Voted
AINA
2007
IEEE

Power and Delay Analysis of The WEAC Protocol Based MANET Under Video Transport

16 years 3 months ago
Power and Delay Analysis of The WEAC Protocol Based MANET Under Video Transport
Abstract— Transporting video over wireless networks has twofold constraints. Not only should it satisfy delay requirements but power minimization and QoS issues should be handled carefully also. Mobile Ad Hoc Networks (MANETs) are more sensitive to these issues where each mobile device acts like a router and thus, routing delay adds significantly to overall end-to-end delay. In this paper, we analyze the performance of the Warning Energy Aware Cluster head / Virtual Base Station-On demand (WEAC/VBS-O) protocol, proposed earlier by one of the authors [1], in terms of average delay, multihop communication and power minimization aspects subject to video traffic. We use H.263 standard to model video traffic in our simulation design. Primarily, we establish a single hop communication between nodes. It is then extended to multihop communication. However, we find that the protocol can support up to 2 hops for an acceptable network performance provided there is a significant number of n...
Hafiz M. Asif, Tarek R. Sheltami
Added 02 Jun 2010
Updated 02 Jun 2010
Type Conference
Year 2007
Where AINA
Authors Hafiz M. Asif, Tarek R. Sheltami
Comments (0)