Sciweavers

ISPD
2009
ACM
127views Hardware» more  ISPD 2009»

Synthesizing a representative critical path for post-silicon delay prediction

16 years 2 months ago
Synthesizing a representative critical path for post-silicon delay prediction
Several approaches to post-silicon adaptation require feedback from a replica of the nominal critical path, whose variations are intended to reflect those of the entire circuit after manufacturing. For realistic circuits, where the number of critical paths can be large, the notion of using a single critical path is too simplistic. This paper overcomes this problem by introducing the idea of synthesizing a representative critical path (RCP), which captures these complexities of the variations. We first prove that the requirement on the RCP is that it should be highly correlated with the circuit delay. Next, we present two novel algorithms to automatically build the RCP. Our experimental results demonstrate that over a number of samples of manufactured circuits, the delay of the RCP captures the worst case delay of the manufactured circuit. The average prediction error of all circuits is shown to be below 2.8% for both approaches. For both our approach and the critical path replica me...
Qunzeng Liu, Sachin S. Sapatnekar
Added 19 May 2010
Updated 19 May 2010
Type Conference
Year 2009
Where ISPD
Authors Qunzeng Liu, Sachin S. Sapatnekar
Comments (0)