Sciweavers

64 search results - page 8 / 13
» A Constraint-Based Method for Project Scheduling with Time W...
Sort
View
ICDM
2008
IEEE
145views Data Mining» more  ICDM 2008»
15 years 3 months ago
Paired Learners for Concept Drift
To cope with concept drift, we paired a stable online learner with a reactive one. A stable learner predicts based on all of its experience, whereas a reactive learner predicts ba...
Stephen H. Bach, Marcus A. Maloof
COMSWARE
2008
IEEE
15 years 3 months ago
On TCP-aware uplink scheduling in IEEE 802.16 networks
Abstract—In this paper we propose two polling based scheduling schemes for applications based on TCP in a multipointto-point IEEE 802.16 network. The first scheme uses TCP conge...
Hemant Kumar Rath, Abhay Karandikar
AIPS
2008
14 years 11 months ago
Generating Robust Schedules Subject to Resource and Duration Uncertainties
We consider the Resource-Constrained Project Scheduling Problem with minimal and maximal time lags under resource and duration uncertainties. To manage resource uncertainties, we ...
Na Fu, Hoong Chuin Lau, Fei Xiao
CORR
2010
Springer
103views Education» more  CORR 2010»
14 years 9 months ago
Efficient Resource Matching in Heterogeneous Grid Using Resource Vector
In this paper, a method for efficient scheduling to obtain optimum job throughput in a distributed campus grid environment is presented; Traditional job schedulers determine job s...
Srirangam V. Addepallil, Per Andersen, George L. B...
ICPADS
1998
IEEE
15 years 1 months ago
The XBW Model for Dependable Real-Time Systems
This paper presents a new conceptual model, the XBWModel. Distributed computing is becoming a cost effective way to implement safety critical control systems. To support the devel...
Vilgot Claesson, Stefan Poledna, Jan Söderber...