Sciweavers

1040 search results - page 81 / 208
» A New Periodicity Lemma
Sort
View
ICCD
2006
IEEE
126views Hardware» more  ICCD 2006»
15 years 6 months ago
Task Merging for Dynamic Power Management of Cyclic Applications in Real-Time Multi-Processor Systems
—In this paper we propose the method of task merging and idle period clustering for dynamic power management (DPM) in a real-time system with multiple processing elements. We sho...
Shaobo Liu, Qinru Qiu, Qing Wu
WEA
2010
Springer
241views Algorithms» more  WEA 2010»
15 years 4 months ago
A Branch-and-Price Algorithm for Multi-mode Resource Leveling
Resource leveling is a variant of resource-constrained project scheduling in which a non-regular objective function, the resource availability cost, is to be minimized. We present ...
Eamonn T. Coughlan, Marco E. Lübbecke, Jens S...
QSHINE
2009
IEEE
15 years 4 months ago
On-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-Lived Sensor Networks
To achieve required sensing coverage for a very long period of time is an important and challenging problem in sensor network design. Recently, Tong et al. have proposed a node rep...
Bin Tong, Zi Li, Guiling Wang, Wensheng Zhang
ICEBE
2009
IEEE
127views Business» more  ICEBE 2009»
15 years 4 months ago
Simulation-Based Evaluation of Workflow Escalation Strategies
Workflows in the service industry sometimes need to deal with multi-fold increases in customer demand within a short period of time. Such spikes in service demand may be caused by...
Ka-Leong Chan, Yain-Whar Si, Marlon Dumas
IROS
2009
IEEE
116views Robotics» more  IROS 2009»
15 years 4 months ago
Adaptive mobile charging stations for multi-robot systems
— We consider systems of mobile robots that execute a transportation task and periodically recharge from a docking station. The location of the docking station has a considerable...
Alex Couture-Beil, Richard T. Vaughan