Sciweavers

174 search results - page 19 / 35
» A Planning Scheduling Methodology for the Constrained Resour...
Sort
View
HICSS
2003
IEEE
134views Biometrics» more  HICSS 2003»
15 years 2 months ago
Scheduling the Supply Chain by Teams of Agents
When a supply chain is established supply chain management (SCM) needs supporting tools for the tasks of operative planning, scheduling, and coordination. These tasks have to be p...
Jürgen Sauer, Hans-Jürgen Appelrath
82
Voted
VLSID
2002
IEEE
98views VLSI» more  VLSID 2002»
15 years 10 months ago
On Test Scheduling for Core-Based SOCs
We present a mathematical model for the problem of scheduling tests for core-based system-on-chip (SOC) VLSI designs. Given a set of tests for each core in the SOC and a set of te...
Sandeep Koranne
ISQED
2005
IEEE
95views Hardware» more  ISQED 2005»
15 years 3 months ago
Power Supply Noise-Aware Scheduling and Allocation for DSP Synthesis
As technology scales down, power supply noise is becoming a performance and reliability bottleneck in modern VLSI. We propose a power supply noise-aware design methodology for hig...
Dongku Kang, Yiran Chen, Kaushik Roy
INFOCOM
2010
IEEE
14 years 7 months ago
Optimal Control of Constrained Cognitive Radio Networks with Dynamic Population Size
Abstract-- In this paper, we consider the problem of optimal control for throughput utility maximization in cognitive radio networks with dynamic user arrivals and departures. The ...
Mahdi Lotfinezhad, Ben Liang, Elvino S. Sousa
WSC
2007
14 years 12 months ago
Simulation tool for manpower forecast loading and resource leveling
Large scale / mega projects are lengthy complex endeavors that require significant planning by management, engineers and construction personnel to ensure the success of the projec...
Mikhail Hanna, Janaka Y. Ruwanpura