In this paper, we propose to use the Huber M-estimator cost function as a contrast function within the complex FastICA algorithm of Bingham and Hyvarinen for the blind separation o...
—In this paper, we address the scheduling problem for Clos-network switches with no buffers at the central stage. Existing scheduling (dispatching) algorithms for this type of sw...
Mei Yang, Mayauna McCullough, Yingtao Jiang, Jun Z...
This paper deals with the load-balancing of machines in a real-world job-shop scheduling problem, with identical machines. The load-balancing algorithm allocates jobs, split into l...
Abstract. We have presented an optimal algorithm for minimal cost loop problem (MCLP), which consists of finding a set of minimum cost loops rooted at a source node. In the MCLP, t...
—The super node algorithm performs model order reduction based on physical principles. Although the algorithm provides us with compact models, its passivity has not thoroughly be...