Sciweavers

43 search results - page 4 / 9
» An Improved AMG-based Method for Fast Power Grid Analysis
Sort
View
ICIP
2006
IEEE
14 years 8 months ago
Redundancy in All Pairs Fast Marching Method
In this paper, we analyze the redundancy in calculating all pairs of geodesic distances on a rectangular grid. Fast marching method is an efficient way to estimate the geodesic di...
Luca Bertelli, Baris Sumengen, B. S. Manjunath
ISPD
2006
ACM
103views Hardware» more  ISPD 2006»
14 years 7 days ago
High accurate pattern based precondition method for extremely large power/ground grid analysis
In this paper, we propose more accurate power/ground network circuit model, which consider both via and ground bounce effects to improve the performance estimation accuracy of on-...
Jin Shi, Yici Cai, Sheldon X.-D. Tan, Xianlong Hon...
ASPDAC
2007
ACM
121views Hardware» more  ASPDAC 2007»
13 years 10 months ago
Timing-Aware Decoupling Capacitance Allocation in Power Distribution Networks
Power supply noise increases the circuit delay, which may lead to performance failure of a design. Decoupling capacitance (decap) addition is effective in reducing the power suppl...
Sanjay Pant, David Blaauw
SADM
2008
178views more  SADM 2008»
13 years 5 months ago
Fast Projection-Based Methods for the Least Squares Nonnegative Matrix Approximation Problem
: Nonnegative matrix approximation (NNMA) is a popular matrix decomposition technique that has proven to be useful across a diverse variety of fields with applications ranging from...
Dongmin Kim, Suvrit Sra, Inderjit S. Dhillon
IAT
2006
IEEE
14 years 10 days ago
Semantic Grid Services for Video Analysis
Employing the power of Semantic Grid services into pervasive problem domains such as video analysis would allow for more effective distributed processing. A vast amount of ecologi...
Gayathri Nadarajan, Yun-Heh Chen-Burger, James Mal...