Sciweavers

5465 search results - page 272 / 1093
» Assigning Types to Processes
Sort
View
ENTCS
2008
156views more  ENTCS 2008»
15 years 4 months ago
Schedulability Criteria and Analysis for Dynamic and Flexible Resource Management
The Flexible Resource Manager (FRM) is a dynamic resource management approach that allows a better utilization of the available resources. However, it necessitates an atomic recon...
Hermann Simon Lichte, Simon Oberthür
JDA
2008
93views more  JDA 2008»
15 years 4 months ago
On-line scheduling of parallel jobs on two machines
We study the problem of on-line scheduling of parallel jobs on two machines. The jobs are parallel in the sense that each of them specifies the number of processors, in this case ...
Wun-Tat Chan, Francis Y. L. Chin, Deshi Ye, Guochu...
TIT
2008
110views more  TIT 2008»
15 years 4 months ago
Optimal Cross-Layer Scheduling of Transmissions Over a Fading Multiaccess Channel
We consider the problem of several users transmitting packets to a base station, and study an optimal scheduling formulation involving three communication layers, namely, the mediu...
Munish Goyal, Anurag Kumar, Vinod Sharma
COMCOM
2004
99views more  COMCOM 2004»
15 years 3 months ago
Performance analysis of a mobile communication network: the tandem case
This paper investigates mobile communication networks consisting of N-cells in tandem. Two models with fixed channel assignment are considered, which correspond to (A) a uni-direc...
Attahiru Sule Alfa, Bin Liu
IAT
2010
IEEE
15 years 2 months ago
An Interactive Tool for Constrained Clustering with Human Sampling
Abstract--This paper describes an interactive tool for constrained clustering that helps users to select effective constraints efficiently during the constrained clustering process...
Masayuki Okabe, Seiji Yamada