Sciweavers

182 search results - page 25 / 37
» Benchmarking the Task Graph Scheduling Algorithms
Sort
View
TSMC
2011
324views more  TSMC 2011»
14 years 4 months ago
Genetic Algorithms With Guided and Local Search Strategies for University Course Timetabling
—The university course timetabling problem (UCTP) is a combinatorial optimization problem, in which a set of events has to be scheduled into time slots and located into suitable ...
Shengxiang Yang, Sadaf Naseem Jat
DAC
1997
ACM
15 years 1 months ago
COSYN: Hardware-Software Co-Synthesis of Embedded Systems
: Hardware-software co-synthesis is the process of partitioning an embedded system specification into hardware and software modules to meet performance, power and cost goals. In t...
Bharat P. Dave, Ganesh Lakshminarayana, Niraj K. J...
ICCAD
2001
IEEE
201views Hardware» more  ICCAD 2001»
15 years 6 months ago
An Integrated Data Path Optimization for Low Power Based on Network Flow Method
Abstract: We propose an effective algorithm for power optimization in behavioral synthesis. In previous work, it has been shown that several hardware allocation/binding problems fo...
Chun-Gi Lyuh, Taewhan Kim, Chien-Liang Liu
ICCAD
2003
IEEE
124views Hardware» more  ICCAD 2003»
15 years 6 months ago
Gradual Relaxation Techniques with Applications to Behavioral Synthesis
Heuristics are widely used for solving computational intractable synthesis problems. However, until now, there has been limited effort to systematically develop heuristics that ca...
Zhiru Zhang, Yiping Fan, Miodrag Potkonjak, Jason ...
SOFSEM
2010
Springer
15 years 6 months ago
Regret Minimization and Job Scheduling
Regret minimization has proven to be a very powerful tool in both computational learning theory and online algorithms. Regret minimization algorithms can guarantee, for a single de...
Yishay Mansour