Sciweavers

3038 search results - page 416 / 608
» Controlling Engineering Problem Solving
Sort
View
101
Voted
RTSS
2005
IEEE
15 years 7 months ago
Optimal Task Rate Selection in Fixed Priority Systems
The design phase of any real-time system requires balancing the limited computational resources against the functional requirements and the performance of the application. The opt...
Enrico Bini, Marco Di Natale
VLSID
2005
IEEE
120views VLSI» more  VLSID 2005»
15 years 7 months ago
On Finding Consecutive Test Vectors in a Random Sequence for Energy-Aware BIST Design
During pseudorandom testing, a significant amount of energy and test application time is wasted for generating and for applying “useless” test vectors that do not contribute t...
Sheng Zhang, Sharad C. Seth, Bhargab B. Bhattachar...
GECCO
2005
Springer
15 years 7 months ago
Evaluating GP schema in context
We propose a new methodology to look at the fitness contributions (semantics) of different schemata in Genetic Programming (GP). We hypothesize that the significance of a schem...
Hammad Majeed, Conor Ryan, R. Muhammad Atif Azad
GECCO
2005
Springer
119views Optimization» more  GECCO 2005»
15 years 7 months ago
Improving GA search reliability using maximal hyper-rectangle analysis
In Genetic algorithms it is not easy to evaluate the confidence level in whether a GA run may have missed a complete area of good points, and whether the global optimum was found....
Chongshan Zhang, Khaled Rasheed
ISLPED
1999
ACM
91views Hardware» more  ISLPED 1999»
15 years 6 months ago
Stochastic modeling of a power-managed system: construction and optimization
-- The goal of a dynamic power management policy is to reduce the power consumption of an electronic system by putting system components into different states, each representing ce...
Qinru Qiu, Qing Wu, Massoud Pedram