Sciweavers

10241 search results - page 1700 / 2049
» Goal-Driven Software Development
Sort
View
JUCS
2008
130views more  JUCS 2008»
15 years 4 months ago
Experimenting the Automated Selection of COTS Components Based on Cost and System Requirements
: In a component-based development process the selection of components is an activity that takes place over multiple lifecycle phases that span from requirement specifications thro...
Vittorio Cortellessa, Ivica Crnkovic, Fabrizio Mar...
TASE
2008
IEEE
15 years 4 months ago
An Optimization-Based Approach for Design Project Scheduling
Concurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design tas...
Ming Ni, Peter B. Luh, Bryan Moser
TASE
2008
IEEE
15 years 4 months ago
Optimization of Joint Replacement Policies for Multipart Systems by a Rollout Framework
Maintaining an asset with life-limited parts, e.g., a jet engine or an electric generator, may be costly. Certain costs, e.g., setup cost, can be shared if some parts of the asset ...
Tao Sun, Qianchuan Zhao, Peter B. Luh, Robert N. T...
TASE
2008
IEEE
15 years 4 months ago
Group Elevator Scheduling With Advance Information for Normal and Emergency Modes
Group elevator scheduling has long been recognized as an important problem for building transportation efficiency, since unsatisfactory elevator service is one of the major complai...
Peter B. Luh, Bo Xiong, Shi-Chung Chang
147
Voted
IS
2007
15 years 4 months ago
Business process mining: An industrial application
Contemporary information systems (e.g., WfM, ERP, CRM, SCM, and B2B systems) record business events in so-called event logs. Business process mining takes these logs to discover p...
Wil M. P. van der Aalst, Hajo A. Reijers, A. J. M....
« Prev « First page 1700 / 2049 Last » Next »