Sciweavers

908 search results - page 23 / 182
» Heuristic Methods for Solving Job-Shop Scheduling Problems
Sort
View
ICC
2008
IEEE
161views Communications» more  ICC 2008»
15 years 10 months ago
Joint Power Control and Link Scheduling in Wireless Networks for Throughput Optimization
—This paper concerns the problem of finding the minimum-length TDMA frame of a power-controlled wireless network subject to traffic demands and SINR (signalto-interference-plus...
Liqun Fu, Soung Chang Liew, Jianwei Huang
102
Voted
SCHEDULING
2010
57views more  SCHEDULING 2010»
14 years 10 months ago
Scheduling technicians and tasks in a telecommunications company
This paper proposes a construction heuristic and an adaptive large neighborhood search heuristic for the technician and task scheduling problem arising in a large telecommunicatio...
Jean-François Cordeau, Gilbert Laporte, Fed...
118
Voted
JSAC
2006
88views more  JSAC 2006»
15 years 3 months ago
Heuristic algorithms for the routing and wavelength assignment of scheduled lightpath demands in optical networks
This paper addresses the problem of routing and wavelength assignment (RWA) of scheduled lightpath demands (SLDs) in wavelength routed optical networks with no wavelength converter...
Nina Skorin-Kapov
AI
2009
Springer
15 years 10 months ago
STFLS: A Heuristic Method for Static and Transportation Facility Location Allocation in Large Spatial Datasets
Abstract. This paper solves a static and transportation facility location allocation problem defined as follows: given a set of locations Loc and a set of demand objects D located ...
Wei Gu, Xin Wang, Liqiang Geng
153
Voted
TSMC
2010
14 years 10 months ago
A Mathematical Programming Solution to the Mars Express Memory Dumping Problem
The memory dumping problem arises in the context of planning and scheduling activities of the Mars Express mission of the European Space Agency. The problem consists of scheduling...
Giovanni Righini, Emanuele Tresoldi