Sciweavers

908 search results - page 98 / 182
» Heuristic Methods for Solving Job-Shop Scheduling Problems
Sort
View
98
Voted
ECAI
2004
Springer
15 years 9 months ago
Multiple Relaxations in Temporal Planning
CRIKEY is a planner that separates out the scheduling from the classical parts of temporal planning. This can be seen as a relaxation of the temporal information during the classic...
Keith Halsey, Derek Long, Maria Fox
127
Voted
ATAL
2007
Springer
15 years 9 months ago
Combinatorial resource scheduling for multiagent MDPs
Optimal resource scheduling in multiagent systems is a computationally challenging task, particularly when the values of resources are not additive. We consider the combinatorial ...
Dmitri A. Dolgov, Michael R. James, Michael E. Sam...
158
Voted
GLOBECOM
2008
IEEE
15 years 10 months ago
Global Optimal Routing, Scheduling and Power Control for Multi-Hop Wireless Networks with Interference
—We consider the problem of joint routing, scheduling and power control in multi-hop wireless networks. We use a linear relation between link capacity and signal to interference ...
Javad Kazemitabar, Vahid Tabatabaee, Hamid Jafarkh...
148
Voted
RSP
1999
IEEE
128views Control Systems» more  RSP 1999»
15 years 7 months ago
3-D Floorplanning: Simulated Annealing and Greedy Placement Methods for Reconfigurable Computing Systems
The advances in the programmable hardware has lead to new architectures where the hardware can be dynamically adapted to the application to gain better performance. There are stil...
Kia Bazargan, Ryan Kastner, Majid Sarrafzadeh
ASPDAC
2008
ACM
135views Hardware» more  ASPDAC 2008»
15 years 5 months ago
Temperature-aware MPSoC scheduling for reducing hot spots and gradients
Thermal hot spots and temperature gradients on the die need to be minimized to manufacture reliable systems while meeting energy and performance constraints. In this work, we solve...
Ayse Kivilcim Coskun, Tajana Simunic Rosing, Keith...