Sciweavers

5683 search results - page 154 / 1137
» Interactive Schedulability Analysis
Sort
View
138
Voted
IPPS
1999
IEEE
15 years 8 months ago
Distributed Scheduling with Decomposed Optimization Criterion: Genetic Programming Approach
Abstract. A new approach to develop parallel and distributed scheduling algorithms for multiprocessor systems is proposed. Its main innovation lies in evolving a decomposition of t...
Franciszek Seredynski, Jacek Koronacki, Cezary Z. ...
189
Voted
FODO
1998
Springer
241views Algorithms» more  FODO 1998»
15 years 8 months ago
2D BubbleUp: Managing Parallel Disks for Media Servers
In this study we present a scheme called two-dimensional BubbleUp (2DB) for managing parallel disks in a multimedia server. Its goal is to reduce initial latency for interactive m...
Edward Y. Chang, Hector Garcia-Molina, Chen Li
CAV
2010
Springer
158views Hardware» more  CAV 2010»
15 years 8 months ago
Model-Checking Parameterized Concurrent Programs Using Linear Interfaces
Abstract. We consider the verification of parameterized Boolean proabstractions of shared-memory concurrent programs with an unbounded number of threads. We propose that such prog...
Salvatore La Torre, P. Madhusudan, Gennaro Parlato
WSC
1998
15 years 5 months ago
The Use of Simulation for Construction Elements Manufacturing
The manufacture of pre-cast concrete building elements consists of a few manufacturing steps. The process itself is simple, but the characteristics of the business are quite rando...
Katy Vern, Ali K. Gunal
HICSS
2002
IEEE
135views Biometrics» more  HICSS 2002»
15 years 9 months ago
Integrated Production Planning and Route Scheduling in Pulp Mill Industry
In this paper we consider the complete supply chain for a large pulp producer in Sweden. The supply chain is divided up in two parts, the pulp production planning problem and the ...
David Bredström, Mikael Rönnqvist