Abstract. The technique of partial order reduction (POR) for probabilistic model checking prunes the state space of the model so that a maximizing scheduler and a minimizing one pe...
Abstract. The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a un...
Abstract. In this paper, we discuss an approach to an operator scheduling problem in a large organization over time with the aim of maintaining service quality and reducing total l...
We present a compositional approach to analyze timing behavior of complex platforms with different scheduling strategies. The approach uses event interfacing in order to couple pr...
Kai Richter, Dirk Ziegenbein, Marek Jersak, Rolf E...
An adaptive fuzzy PID controller with gain scheduling is proposed in this paper. The structure of the proposed gain scheduled fuzzy PID (GS_FPID) controller consists of both fuzzy ...