Sciweavers

790 search results - page 14 / 158
» Limits of Work-Stealing Scheduling
Sort
View
DATE
2006
IEEE
134views Hardware» more  DATE 2006»
15 years 6 months ago
Power constrained and defect-probability driven SoC test scheduling with test set partitioning
1 This paper presents a test scheduling approach for system-onchip production tests with peak-power constraints. An abort-onfirst-fail test approach is assumed, whereby the test is...
Zhiyuan He, Zebo Peng, Petru Eles
95
Voted
RTSS
2006
IEEE
15 years 6 months ago
Parallel Real-Time Task Scheduling on Multicore Platforms
We propose a scheduling method for real-time systems implemented on multicore platforms that encourages certain groups of equal-utilization tasks to be scheduled together. This me...
James H. Anderson, John M. Calandrino
112
Voted
RTCSA
2005
IEEE
15 years 6 months ago
Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems
We present an approach to the analysis and optimization of heterogeneous distributed embedded systems for hard real-time applications. The systems are heterogeneous not only in te...
Traian Pop, Paul Pop, Petru Eles, Zebo Peng
EUROPAR
2009
Springer
15 years 7 months ago
Steady-State for Batches of Identical Task Trees
Abstract In this paper, we focus on the problem of scheduling batches of identical task graphs on a heterogeneous platform, when the task graph consists in a tree. We rely on stead...
Sékou Diakité, Loris Marchal, Jean-M...
ICCSA
2005
Springer
15 years 6 months ago
Awareness Scheduling and Algorithm Implementation for Collaborative Virtual Environment
The limitation of network resource reduces the awareness capability of CVE system, which becomes the main bottleneck for applications in Internet. In this paper, we study the relat...
Yu Sheng, Dongming Lu, Yifeng Hu, Qingshu Yuan