Sciweavers

790 search results - page 43 / 158
» Limits of Work-Stealing Scheduling
Sort
View
92
Voted
COCOON
2005
Springer
15 years 6 months ago
Min-Energy Voltage Allocation for Tree-Structured Tasks
Westudyjobschedulingonprocessorscapableofrunningatvariablevoltage/speed tominimizeenergyconsumption.Eachjob ina probleminstanceisspecifiedbyitsarrivaltime and deadline, together w...
Minming Li, Becky Jie Liu, Frances F. Yao
SCOPES
2005
Springer
15 years 6 months ago
Generic Software Pipelining at the Assembly Level
Software used in embedded systems is subject to strict timing and space constraints. The growing software complexity creates an urgent need for fast program execution under the co...
Daniel Kästner, Markus Pister
COCOON
2004
Springer
15 years 6 months ago
Transshipment Through Crossdocks with Inventory and Time Windows
Abstract. The supply chain between manufacturers and retailers always includes transshipments through a network of locations. A major challenge in making demand meet supply has bee...
Andrew Lim, Zhaowei Miao, Brian Rodrigues, Zhou Xu
CODES
2003
IEEE
15 years 5 months ago
Synthesis of real-time embedded software with local and global deadlines
Current methods cannot synthesize real-time embedded software applications when the global deadline of a task is shorter than the total of all local deadlines along a critical pat...
Pao-Ann Hsiung, Cheng-Yi Lin
123
Voted
AIPS
2007
15 years 2 months ago
The Manpower Allocation Problem with Time Windows and Job-Teaming Constraints
The Manpower Allocation Problem with Time Windows, Job-Teaming Constraints and a limited number of teams (mMAPTWTC) is a crew scheduling problem faced in several different context...
Anders Dohn, Esben Kolind, Jens Clausen