This paper presents three methods implemented in the activity-based construction modeling and simulation (ABC) system for validating a construction simulation. The first method re...
-- In a WAN established infrastructure, one of the main problems ATM network planners and users face, when greater than T1/E1 bandwidth is required, is the high cost associated to ...
The proposed implementation is a monitor system able to train operators for on-line real time manufacturing control in order to analyze the performance of a production process. Th...
Agostino G. Bruzzone, Pietro Giribone, Roberto Rev...
We present Wit, a non-intrusive tool that builds on passive monitoring to analyze the detailed MAC-level behavior of operational wireless networks. Wit uses three processing steps...
Ratul Mahajan, Maya Rodrig, David Wetherall, John ...
In this paper, the impact of timing a setup operation on the work-in-process and cycle time is investigated. Using a small example of an reentrant production system, it is shown t...
Martin Romauch, Walter Laure, Georg Seidel, Christ...