Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
This paper discusses the use of simulation in a new context. Most often QUEST is viewed as a stand-alone simulation tool to analyze and understand shop floor behavior. It has rare...
This paper presents the design of user-level scheduling hierarchies in the Composite component-based system. The motivation for this is centered around the design of a system that...
—Energy-efficiency is becoming one of the most critical issues in embedded system design. In Network-on-Chip (NoC) based heterogeneous Multiprocessor Systems, the energy consump...
Jia Huang, Christian Buckl, Andreas Raabe, Alois K...
Computational grids are increasingly being deployed in campus environments to provide unified access to distributed and heterogeneous resources such as clusters, storage arrays, ...