Sciweavers

440 search results - page 76 / 88
» Multi-Granularity Resource Reservations
Sort
View
COR
2007
81views more  COR 2007»
14 years 11 months ago
Job scheduling methods for reducing waiting time variance
Minimizing Waiting Time Variance (WTV) is a job scheduling problem where we schedule a batch of n jobs, for servicing on a single resource, in such a way that the variance of thei...
Nong Ye, Xueping Li, Toni Farley, Xiaoyun Xu
118
Voted
NETWORK
2006
218views more  NETWORK 2006»
14 years 11 months ago
Quality of service for packet telephony over mobile ad hoc networks
IP telephony over mobile ad hoc networks is a topic of emerging interest in the research arena as one of the paths toward the fixed-mobile convergence in telecommunications networ...
Paolo Giacomazzi, Luigi Musumeci, Giuseppe Caizzon...
INFFUS
2007
107views more  INFFUS 2007»
14 years 11 months ago
An information fusion demonstrator for tactical intelligence processing in network-based defense
The Swedish Defence Research Agency (FOI) has developed a concept demonstrator called the Information Fusion Demonstrator 2003 (IFD03) for demonstrating information fusion methodo...
Simon Ahlberg, Pontus Hörling, Katarina Johan...
JSA
2000
115views more  JSA 2000»
14 years 11 months ago
Scheduling optimization through iterative refinement
Scheduling DAGs with communication times is the theoretical basis for achieving efficient parallelism on distributed memory systems. We generalize Graham's task-level in a ma...
Mayez A. Al-Mouhamed, Adel Al-Massarani
COR
2007
106views more  COR 2007»
14 years 11 months ago
On a stochastic sequencing and scheduling problem
We present a framework for solving multistage pure 0–1 programs for a widely used sequencing and scheduling problem with uncertainty in the objective function coefficients, the...
Antonio Alonso-Ayuso, Laureano F. Escudero, M. Ter...