Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
—This paper considers the design of handoff rerouting algorithms for reducing the overall session cost in personal communication systems (PCS). Most modern communication systems ...
BLASTn is a ubiquitous tool used for large scale DNA analysis. Detailed profiling tests reveal that the most computationally intensive sections of the BLASTn algorithm are the sc...
Network administrators are faced with the increasingly challenging task of monitoring their network’s health in real time, drawing upon diverse and voluminous measurement data fe...
Lukasz Golab, Theodore Johnson, Subhabrata Sen, Je...
The clinical interpretation of fetal heart rate traces is a difficult task that has led to the development computerised assessment systems. These systems are limited by their inabi...
Jonathan F. Skinner, Jonathan M. Garibaldi, Emmanu...