Sciweavers

25 search results - page 1 / 5
» On-line scheduling of unit time jobs with rejection: minimiz...
Sort
View
90
Voted
ORL
2002
81views more  ORL 2002»
14 years 10 months ago
On-line scheduling of unit time jobs with rejection: minimizing the total completion time
We consider on-line scheduling of unit time jobs on a single machine with job-dependent penalties. The jobs arrive on-line (one by one) and can be either accepted and scheduled, o...
Leah Epstein, John Noga, Gerhard J. Woeginger
90
Voted
MOR
2000
90views more  MOR 2000»
14 years 10 months ago
A PTAS for Minimizing the Total Weighted Completion Time on Identical Parallel Machines
We consider the problem of scheduling a set of n jobs on m identical parallel machines so as to minimize the weighted sum of job completion times. This problem is NP-hard in the s...
Martin Skutella, Gerhard J. Woeginger
COR
2007
80views more  COR 2007»
14 years 10 months ago
Scheduling with tool changes to minimize total completion time under controllable machining conditions
Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention...
M. Selim Akturk, Jay B. Ghosh, Rabia K. Kayan
110
Voted
CONSTRAINTS
2011
14 years 5 months ago
A global constraint for total weighted completion time for unary resources
We introduce a novel global constraint for the total weighted completion time of activities on a single unary capacity resource. For propagating the constraint, we propose an O(n4...
András Kovács, J. Christopher Beck
90
Voted
FSTTCS
2010
Springer
14 years 8 months ago
Minimizing Busy Time in Multiple Machine Real-time Scheduling
We consider the following fundamental scheduling problem. The input consists of n jobs to be scheduled on a set of machines of bounded capacities. Each job is associated with a re...
Rohit Khandekar, Baruch Schieber, Hadas Shachnai, ...