Sciweavers

874 search results - page 51 / 175
» Optimal Scheduling of Contract Algorithms for Anytime Proble...
Sort
View
ESWA
2008
162views more  ESWA 2008»
14 years 10 months ago
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
The proportionate flow shop (PFS) is considered as a unique case of the flow shop problem in which the processing times of the operations belonging to the same job are equal. A pr...
Der-Fang Shiau, Shu-Chen Cheng, Yueh-Min Huang
AUTOMATICA
2006
140views more  AUTOMATICA 2006»
14 years 10 months ago
On a stochastic sensor selection algorithm with applications in sensor scheduling and sensor coverage
In this note we consider the following problem. Suppose a set of sensors is jointly trying to estimate a process. One sensor takes a measurement at every time step and the measure...
Vijay Gupta, Timothy H. Chung, Babak Hassibi, Rich...
MOBICOM
2009
ACM
15 years 4 months ago
Optimal beam scheduling for multicasting in wireless networks
We consider the problem of efficient link-layer multicasting in wireless networks with switched beamforming antennas. The inherent tradeoff between multicasting and beamforming ...
Karthikeyan Sundaresan, Kishore Ramachandran, Samp...
ICCAD
2001
IEEE
201views Hardware» more  ICCAD 2001»
15 years 6 months ago
An Integrated Data Path Optimization for Low Power Based on Network Flow Method
Abstract: We propose an effective algorithm for power optimization in behavioral synthesis. In previous work, it has been shown that several hardware allocation/binding problems fo...
Chun-Gi Lyuh, Taewhan Kim, Chien-Liang Liu
WASA
2010
Springer
288views Algorithms» more  WASA 2010»
14 years 8 months ago
Approaching the Optimal Schedule for Data Aggregation in Wireless Sensor Networks
Abstract. Due to the large-scale ad hoc deployments and wireless interference, data aggregation is a fundamental but time consuming task in wireless sensor networks. This paper foc...
Pei Wang, Yuan He, Liusheng Huang