Sciweavers

874 search results - page 58 / 175
» Optimal Scheduling of Contract Algorithms for Anytime Proble...
Sort
View
ANOR
2008
171views more  ANOR 2008»
15 years 20 hour ago
A branch and bound method for the job-shop problem with sequence-dependent setup times
This paper deals with the job-shop scheduling problem with sequencedependent setup times. We propose a new method to solve the makespan minimization problem to optimality. The met...
Christian Artigues, Dominique Feillet
ICC
2007
IEEE
168views Communications» more  ICC 2007»
15 years 6 months ago
Opportunistic Link Scheduling with QoS Requirements in Wireless Ad Hoc Networks
— In this paper, we study the link layer scheduling problem in wireless ad hoc networks. In such a network, the communication links compete for the scarce and time-varying wirele...
Qing Chen, Qian Zhang, Zhisheng Niu
JCO
2000
116views more  JCO 2000»
14 years 11 months ago
Multi-phase Algorithms for Throughput Maximization for Real-Time Scheduling
We consider the problem of off-line throughput maximization for job scheduling on one or more machines, where each job has a release time, a deadline and a profit. Most of the ver...
Piotr Berman, Bhaskar DasGupta
CCE
2004
14 years 11 months ago
Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
The idea of cyclic scheduling is commonly utilized to address short-term scheduling problems for multiproduct batch plants under the assumption of relatively stable operations and...
Dan Wu, Marianthi G. Ierapetritou
COR
2010
119views more  COR 2010»
15 years 1 hour ago
Algorithms for a realistic variant of flowshop scheduling
This paper deals with a realistic variant of flowshop scheduling, namely the hybrid flexible flowshop. A hybrid flowshop mixes the characteristics of regular flowshops and paralle...
B. Naderi, Rubén Ruiz, M. Zandieh