Sciweavers

149 search results - page 14 / 30
» Optimal Scheduling of Contract Algorithms with Soft Deadline...
Sort
View
DAC
2005
ACM
15 years 10 months ago
Optimal procrastinating voltage scheduling for hard real-time systems
This paper presents an optimal procrastinating voltage scheduling (OP-DVS) for hard real-time systems using stochastic workload information. Algorithms are presented for both sing...
Yan Zhang, Zhijian Lu, John Lach, Kevin Skadron, M...
GECCO
2005
Springer
136views Optimization» more  GECCO 2005»
15 years 3 months ago
Stress testing real-time systems with genetic algorithms
Reactive real-time systems have to react to external events within time constraints: Triggered tasks must execute within deadlines. The goal of this article is to automate, based ...
Lionel C. Briand, Yvan Labiche, Marwa Shousha
IPL
2008
80views more  IPL 2008»
14 years 9 months ago
A simpler competitive analysis for scheduling equal-length jobs on one machine with restarts
We consider the online problem of scheduling jobs with equal processing times on a single machine. Each job has a release time and a deadline, and the goal is to maximize the numb...
Michael H. Goldwasser, Arundhati Bagchi Misra
RTSS
2002
IEEE
15 years 2 months ago
Maximizing the System Value while Satisfying Time and Energy Constraints
Typical real-time scheduling theory has addressed deadline and energy constraints as well as deadline and reward constraints simultaneously in the past. However, we believe that e...
Cosmin Rusu, Rami G. Melhem, Daniel Mossé
RTSS
1992
IEEE
15 years 1 months ago
Scheduling Sporadic Tasks with Shared Resources in Hard-Real-Time Systems
The problem of scheduling a set of sporadic tasks that share a set of serially reusable, single unit software resources on a single processor is considered. The correctness condit...
Kevin Jeffay