Sciweavers

542 search results - page 17 / 109
» Optimal delay scheduling in networks with arbitrary constrai...
Sort
View
MASS
2010
14 years 7 months ago
You can't get there from here: Sensor scheduling with refocusing delays
We study a problem in which a single sensor is scheduled to observe sites periodically, motivated by applications in which the goal is to maintain up-to-date readings for all the o...
Yosef Alayev, Amotz Bar-Noy, Matthew P. Johnson, L...
TCAD
1998
114views more  TCAD 1998»
14 years 9 months ago
Behavioral optimization using the manipulation of timing constraints
— We introduce a transformation, named rephasing, that manipulates the timing parameters in control-data-flow graphs (CDFG’s) during the high-level synthesis of data-pathinten...
Miodrag Potkonjak, Mani B. Srivastava
TCAD
2002
91views more  TCAD 2002»
14 years 9 months ago
Retiming and clock scheduling for digital circuit optimization
Abstract--This paper investigates the application of simultaneous retiming and clock scheduling for optimizing synchronous circuits under setup and hold constraints. Two optimizati...
Xun Liu, Marios C. Papaefthymiou, Eby G. Friedman
92
Voted
GLOBECOM
2008
IEEE
15 years 4 months ago
Multi-Cluster Multi-Parent Wake-Up Scheduling in Delay-Sensitive Wireless Sensor Networks
—Immediate notification of urgent but rare events and delivery of time sensitive actuation commands appear in many practical wireless sensor and actuator network applications. M...
Huang Lee, Abtin Keshavarzian, Hamid K. Aghajan
DAC
1995
ACM
15 years 1 months ago
Rephasing: A Transformation Technique for the Manipulation of Timing Constraints
- We introduce a transformation, named rephasing, that manipulates the timing parameters in control-dataflow graphs. Traditionally high-level synthesis systems for DSP have either ...
Miodrag Potkonjak, Mani B. Srivastava