A Project Scheduling Problem consists in deciding who does what during the software project lifetime. This is a capital issue in the practice of software engineering, since the to...
We consider the energy consumed in radio transmission of a set of sensors forming a data gathering wireless network. Our objective is to enhance the lifetime of such networks by e...
Samar Agnihotri, Pavan Nuggehalli, H. S. Jamadagni
the level of abstraction in system design promises to enable faster exploration of the design space at early stages. While scheduling decision for embedded software has great impa...
In this note we consider the following problem. Suppose a set of sensors is jointly trying to estimate a process. One sensor takes a measurement at every time step and the measure...
Vijay Gupta, Timothy H. Chung, Babak Hassibi, Rich...
The one-step anticipatory algorithm (1s-AA) is an online algorithm making decisions under uncertainty by ignoring future non-anticipativity constraints. It makes near-optimal decis...