Sciweavers

2652 search results - page 117 / 531
» Path Differentials and Applications
Sort
View
ASPDAC
2004
ACM
107views Hardware» more  ASPDAC 2004»
15 years 10 months ago
Minimization of the expected path length in BDDs based on local changes
— In many verification tools methods for functional simulation based on reduced ordered Binary Decision Diagrams (BDDs) are used. The evaluation time for a BDD can be crucial an...
Rüdiger Ebendt, Wolfgang Günther, Rolf D...
DATE
2002
IEEE
123views Hardware» more  DATE 2002»
15 years 9 months ago
False Path Elimination in Quasi-Static Scheduling
We have developed a technique to compute a Quasi Static Schedule of a concurrent specification for the software partition of an embedded system. Previous work did not take into a...
G. Arrigoni, L. Duchini, Claudio Passerone, Lucian...
JUCS
2007
112views more  JUCS 2007»
15 years 4 months ago
Internet Path Behavior Prediction via Data Mining: Conceptual Framework and Case Study
: In this paper we propose an application of data mining methods in the prediction of the availability and performance of Internet paths. We deploy a general decision-making method...
Leszek Borzemski
TON
1998
68views more  TON 1998»
15 years 4 months ago
Optimal capacity placement for path restoration in STM or ATM mesh-survivable networks
Abstract—The total transmission capacity required by a transport network to satisfy demand and protect it from failures contributes significantly to its cost, especially in long...
Rainer R. Iraschko, Mike H. MacGregor, Wayne D. Gr...
IEAAIE
2010
Springer
15 years 2 months ago
Strategies for Incorporating Knowledge Defects and Path Length in Trust Aggregation
The ability for a user to accurately estimate the amount of trust to be placed in a peer user is gaining more and more attention in social network applications. Trust aggregation p...
Nele Verbiest, Chris Cornelis, Patricia Victor, En...