CRIKEY is a planner that separates out the scheduling from the classical parts of temporal planning. This can be seen as a relaxation of the temporal information during the classic...
While current manufacturing systems are built to avoid uncertainty, the increase of setup reconfiguration frequency and ever higher numbers of variants produced on the same syste...
Earthwork projects involve moving specific amounts of earth from a discrete set of source locations to a discrete set of destinations. Constructors use different methods and equip...
— The present paper introduces an evaluation of the manipulation performance of a robotic arm with respect to control accuracy and mechanical efficiency, taking into considerati...
This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The MISUS system combines techniques...
Tara A. Estlin, Daniel M. Gaines, Forest Fisher, R...