Sciweavers

64 search results - page 6 / 13
» Preemptive Scheduling of Equal-Length Jobs in Polynomial Tim...
Sort
View
DATE
2008
IEEE
95views Hardware» more  DATE 2008»
15 years 3 months ago
Improvements in Polynomial-Time Feasibility Testing for EDF
This paper presents two fully polynomial-time sufficient feasibility tests for EDF when considering periodic tasks with arbitrary deadlines and preemptive scheduling on uniproces...
Alejandro Masrur, Sebastian Drossler, Georg Farber
75
Voted
ATS
2003
IEEE
93views Hardware» more  ATS 2003»
15 years 2 months ago
Optimal System-on-Chip Test Scheduling
1 In this paper, we show that the scheduling of tests on the test access mechanism (TAM) is equivalent to independent job scheduling on identical machines and we make use of an exi...
Erik Larsson, Hideo Fujiwara
COR
2008
69views more  COR 2008»
14 years 9 months ago
Single-machine group scheduling problems with deterioration consideration
In many realistic situations, a job processed later consumes more time than the same job when it is processed earlier; this phenomenon is known as deteriorating jobs. However, job...
Chin-Chia Wu, Yau-Ren Shiau, Wen-Chiung Lee
87
Voted
SWAT
2004
Springer
125views Algorithms» more  SWAT 2004»
15 years 2 months ago
The Optimal Online Algorithms for Minimizing Maximum Lateness
It is well known that the Earliest-Deadline-First (EDF) and the Least-Laxity-First (LLF) algorithms are optimal algorithms for the problem of preemptively scheduling jobs that arr...
Patchrawat Uthaisombut
73
Voted
SIAMCOMP
2010
104views more  SIAMCOMP 2010»
14 years 4 months ago
Approximation Algorithms for Scheduling Parallel Jobs
Abstract. In this paper we study variants of the non-preemptive parallel job scheduling problem where the number of machines is polynomially bounded in the number of jobs. For this...
Klaus Jansen, Ralf Thöle