Suppose we are given a set of objects that cover a region and a duration associated with each object. Viewing the objects as jobs, can we schedule their beginning times to maximiz...
Adam L. Buchsbaum, Alon Efrat, Shaili Jain, Suresh...
— Linial, London and Rabinovich [16] and Aumann and Rabani [3] proved that the min-cut max-flow ratio for general maximum concurrent flow problems (when there are k commodities...
In this paper, we consider a variation of the Euclidean Steiner Tree Problem in which the space underlying the set of nodes has a specified non-uniform cost structure. This proble...
In this paper we propose a uniform approach to deal with incremental problems on digraphs and with decremental problems on dags generalizing a technique used by La Poutr´e and va...
This work proposes a new problem of identifying large and tangled logic structures in a synthesized netlist. Large groups of cells that are highly interconnected to each other can...
Tanuj Jindal, Charles J. Alpert, Jiang Hu, Zhuo Li...