This paper establishes a two-phase model to explore the financial risk of construction project under uncertain construction duration. Treated as a random variable in the model, th...
Concurrent and distributed systems have traditionally been modelled using nondeterministic transitions over configurations. The minism provides an abstraction over scheduling, net...
— The capacity of wireless multi-hop networks has been studied extensively in recent years. Most existing work tackles the problem from an asymptotic perspective and assumes a si...
— We propose to classify the behaviors of a mobile robot thanks to topological methods as an alternative to metric ones. To do so, we adapt an analysis scheme from Physics of non...
Forecasting is of prime importance for accuracy in decision making. For data sets containing high autocorrelations, failure to account for temporal dependence will result in poor ...