Sciweavers

100 search results - page 16 / 20
» Reliability-Aware Optimization for DVS-Enabled Real-Time Emb...
Sort
View
ISLPED
2007
ACM
123views Hardware» more  ISLPED 2007»
14 years 11 months ago
Approximation algorithms for power minimization of earliest deadline first and rate monotonic schedules
We address power minimization of earliest deadline first and ratemonotonic schedules by voltage and frequency scaling. We prove that the problems are NP-hard, and present (1+ ) f...
Sushu Zhang, Karam S. Chatha, Goran Konjevod
ACSD
2005
IEEE
90views Hardware» more  ACSD 2005»
15 years 3 months ago
Extensible and Scalable Time Triggered Scheduling
The objective of this paper is to present how to design a system that can accommodate additional functionality with either no changes to the design or adding architectural modules...
Wei Zheng, Jike Chong, Claudio Pinello, Sri Kanaja...
DAC
2009
ACM
15 years 4 months ago
On-line thermal aware dynamic voltage scaling for energy optimization with frequency/temperature dependency consideration
With new technologies, temperature has become a major issue to be considered at system level design. Without taking temperature aspects into consideration, no approach to energy o...
Min Bao, Alexandru Andrei, Petru Eles, Zebo Peng
ISSS
2002
IEEE
154views Hardware» more  ISSS 2002»
15 years 2 months ago
Optimal Code Size Reduction for Software-Pipelined and Unfolded Loops
Software pipelining and unfolding are commonly used techniques to increase parallelism for DSP applications. However, these techniques expand the code size of the application sign...
Bin Xiao, Zili Shao, Chantana Chantrapornchai, Edw...
RTCSA
2003
IEEE
15 years 2 months ago
Scheduling Jobs with Multiple Feasible Intervals
This paper addresses the problem of scheduling real-time jobs that have multiple feasible intervals. The problem is NP-hard. We present an optimal branch-and-bound algorithm. When...
Chi-Sheng Shih, Jane W.-S. Liu, Infan Kuok Cheong