Sciweavers

1199 search results - page 148 / 240
» Resource Co-Allocation in Computational Grids
Sort
View
HPDC
2008
IEEE
14 years 10 months ago
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids
This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large...
Marco Pasquali, Ranieri Baraglia, Gabriele Capanni...
IPPS
2008
IEEE
15 years 4 months ago
An adaptive parallel pipeline pattern for grids
This paper introduces an adaptive parallel pipeline pattern which follows the GRASP (Grid-Adaptive Structured Parallelism) methodology. GRASP is a generic methodology to incorpora...
Horacio González-Vélez, Murray Cole
IPPS
2008
IEEE
15 years 4 months ago
NETEMBED: A network resource mapping service for distributed applications
Emerging configurable infrastructures (large-scale overlays, grids, distributed testbeds, and sensor networks among others) comprise diverse sets of computing resources and netwo...
Jorge Londoño, Azer Bestavros
CCGRID
2009
IEEE
15 years 4 months ago
Scheduling Strategies for Cycle Scavenging in Multicluster Grid Systems
The use of today’s multicluster grids exhibits periods of submission bursts with periods of normal use and even of idleness. To avoid resource contention, many users employ obse...
Omer Ozan Sonmez, Bart Grundeken, Hashim H. Mohame...
PDPTA
2004
14 years 11 months ago
On the Use of NSGrid for Accurate Grid Schedule Evaluation
Abstract Computational Grids consist of a multitude of geographically distributed resources. The co-allocation of several of those resources allows for the execution of highly comp...
Bruno Volckaert, Pieter Thysebaert, Marc De Leenhe...